dongarandClaude Opus 5.5 83804fe02a Put work items in the state store, and bind the log to them (M1.1)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 1m14s
Development Plan M1.1, as discussed.

- Schema v4: a work_items table (id, scope, title, status, outcome,
  position, data) and an agent row whose active_item points at one
  (NULL: idle). Canonical events and intents carry their work item, and
  events their actor. Older stores are refused with a clear message:
  there was no production data, so no migration (the mechanism stays).
- The log is reached through a Transcript bound to one work item and
  one actor: store.transcript(item, actor) reads only that item and
  writes with both. The planner, executor, delegation and expert desk
  get one per call from the orchestrator instead of holding the store,
  so a component can neither read another task's events (the planner
  read every earlier task's, #78) nor write without attribution.
  store.all_events() is kept for readers that span items (evaluation
  capture, dumps). Intents are begun through the transcript or with
  work_item=, so each belongs to its item.
- The orchestrator opens a work item on 'use', closes it with its
  outcome (completed or abandoned), and carries what the operator said
  while idle into the new item as copies with their origin, so a task
  sent before 'use' is still planned from (D1). control.py keeps its
  state machine through get_state()/transition(), now over the active
  work item, until M2.6 retires it.
- nisse_dev.dump shows work items and each event's item and actor.

Tests: test_work_items.py (scoping, attribution, intent ownership,
restart, outcomes, carried messages, a second task never seeing the
first); the suites updated for the per-call transcript.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-01 23:20:29 +00:00
dongarandClaude Opus 5.5 1ad0b2147d Retire the old build spec, and point every reference at the architecture (M0.1)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 1m22s
Development Plan M0.1. Every section reference in code, tests, specs/,
the example config, the tuning guide, and the CLAUDE.md and README files
now cites docs/Architecture.md (P, L, D, O, X, Q) instead of the old
spec's A-H, and docs/Architecture-Build-Spec.md is deleted (git keeps
it). The plan's old-to-new table goes with it.

Mostly mechanical, with a per-site choice where one old section split:
A4 became L2 where it meant stop/abandon/the loop and L3 where it meant
approvals; A10 became L6 in the context-budget code and L7 elsewhere; B2
became D4 for outbound Gitea and publishing and D5 for review intake;
'A3 step N' became the matching step of L8's boot sequence. Comments
describing behaviour the architecture drops (planning always escalating,
thresholds tuned at an old build step) now describe the current code and
point at the Development Plan.

docs/Architecture.md gains one line the rewrite missed: intake outages
delay but never fail work (old B2), now in L5, where the poller and
Matrix code cite it.

Comments and docs only; no behaviour change.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-01 00:17:48 +00:00
dongarandClaude Opus 5.5 97863c1939 Bind approvals and feedback to the revision they were about
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 1m16s
Fixes counterexamples 1-4 from specs/orchestrator.qnt: a repeated
'approve', 'approve rev-1' meant for the architecture, approving on both
channels, and 'approve' plus an afterthought all landed on the next
plan, one the operator had not seen.

- Revisions are numbered across the work item (A4 already required
  monotonic tags; the code numbered per gate), so rev-N names one plan.
- Each reply is stamped on arrival with the revision that was up: in
  Matrix the one whose approval request had been sent (a plain value
  the transport thread reads, restored on boot), in Gitea the latest
  plan comment older than the reply (board.posts).
- Gate.evaluate applies a reply that names no revision only if its stamp
  is the current revision. Otherwise an approval is not applied and
  feedback rejects nothing (it is still in the transcript), and the
  agent says which revision is up. 'approve rev-N' binds by its number.
- Spec A4 states both rules. The model applies them; scenarios 1-4 now
  expect the properties to hold, and both held over 200,000 random
  traces and Apalache's exhaustive check to depth 8.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-09-29 19:13:20 +00:00