Commit Graph
8 Commits
Author SHA1 Message Date
dongarandClaude Opus 5.5 154a0c3fa8 M7.1: extract nisse-core
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 1m42s
CI / e2e (pull_request) Successful in 4m0s
What isn't the dev agent's moves to nisse-core, unchanged in behaviour,
with its tests: canonical, render, render_anthropic, llm, catalog, probe,
context, views, state, reconcile, worker, cancel, dump, transport, matrix,
execution, testing, vault, memory, oplog, envfile and gitea (whole).

- nisse_core.state.StateStore holds the tables every agent has; an
  agent's subclass adds its tables (version, migrations), roles and
  views. nisse_dev.state.StateStore adds the build VM blocks (v5).
- views.project takes what each role is shown, rather than a fixed table.
- Vault takes the agent's name (agent=), for provenance.
- A test that nisse_core never imports an agent.
- The loop, config, git, delegation, expert, tools and evals stay in
  nisse-dev until nisse-ops has a loop to share.

Docs: the Development Plan marks M7.1 done and notes that Phase 6 waits on
the agent host and Terraform; Architecture Part L names the package.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01J5Utyfzw7gF7UhjRDEtjTk
2026-10-13 18:37:01 +00:00
dongarandClaude Opus 5.5 6ae2375194 M2.8: switch over to the new loop
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 2m16s
CI / e2e (pull_request) Successful in 10m51s
nisse-dev now runs only the conversational loop. The gated state machine
it was built alongside is gone:

- Removed control.py, planner.py, executor.py, approvals.py, gates.py
  (command_form moves to loop/reader.py), publish.py and poller.py, the
  old assembly in agent.py (its shared helpers move to loop/build.py),
  the store's state-machine view (get_state, transition), their tests,
  the old end-to-end and live planning/milestone/gate tests, and
  specs/orchestrator.qnt with its scenarios.
- Roles are driver, helper, expert and classifier; driver is required.
  loop:, roles.planner, roles.executor and tuning.executor are refused
  with what to use instead; tuning.driver takes the turn cap and failure
  limit.
- The benchmark and the capability matrix measure the driver: the
  loop's own system prompt and tools, the task's plan as the agreed
  restatement. Task plans end with finish_milestone, so earlier runs
  show as (old); stored runs' executor tuning reads as the driver's.
- A delegation on the loop records what its helper's alias resolved to
  (L9), as the old path's did.
- The dump shows a work item's revision and what it waits for.
- Behaviour the old tests covered and the loop shares stays covered:
  driver runs that fail on a model call, stop mid-turn, reset the
  failure count; go-aheads ignoring case and punctuation; a request too
  big to fit is never sent; the assembly tests, now on build_loop_agent.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-08 03:12:58 +00:00
dongarandClaude Opus 5.5 d7e4fd0938 M1.5 accepted: the tests run over a published image
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 2m10s
CI / e2e (pull_request) Successful in 2m54s
- The Dockerfile's test stage stacks on TEST_BASE: this build's agent by
  default, or a published image. It adds only the test tools (uv export
  of the dev group into the image's environment), never reinstalling the
  agent, so the suite tests the image as published.
- scripts/e2e.sh --image passes NISSE_E2E_MODEL into the container.
- The plan marks M1.5 done: v0.1.0's published image passed the whole e2e
  suite (9 of 9, 11m37s), with the release's own tests over it.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-07 23:09:08 +00:00
dongarandClaude Opus 5.5 0660fa3c51 The agent as a container image (M1.5)
CI / checks (push) Skipped
CI / e2e (pull_request) Failing after 49m48s
CI / checks (pull_request) Successful in 10m0s
CI / image (pull_request) Successful in 27s
- Dockerfile: built with uv into /opt/nisse (installed, not editable),
  run on python:3.12-slim with openssh-client as user nisse; stateless,
  with state in a /var/lib/nisse-dev volume, config mounted at
  /etc/nisse-dev/nisse-dev.yaml, secrets as environment variables, keys
  mounted read-only. 202 MB. Its `test` stage adds the tests and their
  tools over the installed package (UV_NO_SYNC, so `uv run` never swaps
  in the source tree); the default target is the agent.
- scripts/e2e.sh --image REF runs the suite inside an image's test stage,
  on its own sshd.
- CI builds both images on every PR (nothing pushed); release.yml pushes
  gitea.dongar.net/dongar/nisse-dev:<tag> and :latest on a v* tag, with
  the REGISTRY_TOKEN secret.
- scripts/bringup.sh builds the code under test into an image and runs it
  in the systemd unit (root, $E2E mounted at its own path); `plan` prints
  what it would run; the build-VM set-aside reads the projects: config.

Checked: the image refuses to start without a config, runs as uid 10001;
one e2e test passed from the test stage (2m45s, $0).

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-07 19:50:59 +00:00
dongarandClaude Opus 5.5 6db80dfb4b End-to-end tests on a local model, and in CI on every PR
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 5m26s
CI / e2e (pull_request) Successful in 17m27s
- Every e2e role runs on qwen3.8-27b on the RTX 4090 (e2e_roles();
  NISSE_E2E_MODEL overrides, e.g. claude-haiku-4-5). The first full run
  passed 7 of 8 in 26 minutes for $0.0000; the eighth was a real finding,
  fixed with the new-project PR.
- scripts/e2e.sh reports a run's spend on the test key and the day's total
  against its budget: above $0 on the local model means a paid fallback.
- CI runs the suite as its own job on pull requests (not pushes to main),
  on a throwaway sshd (--local), cancelling a run a newer push supersedes,
  so the checks job still reports in minutes.
- The plan says so: e2e on every PR; locally only -k / --lf.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-07 15:14:43 +00:00
dongarandClaude Opus 5.5 37965aefca Fix the run-breaking tool-result order; e2e test runs the slice (M2.1, PR D)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 2m17s
The first live run of the new loop's e2e test found that a fact recorded
while start_milestone was in flight landed between the tool call and its
result; both API formats reject that, so every later request in the run
failed. Views now keep each result right after its call. Scripted test
models check the APIs' ordering rules, so this can't pass unit tests
again.

The e2e tests no longer depend on the sandbox's history: each run asks for
a uniquely named function and works against a base branch of its own,
deleted afterwards. The review step asks for a change that can't already
be there. The scripted operator gives up after five fruitless answers, and
each run keeps its state store for inspection. The driver's prompt says
review fixes stay in the current milestone.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-03 15:11:06 +00:00
dongarandClaude Opus 5.5 897181b0f4 Add the end-to-end test of the new loop's slice (M2.1, PR D part 2)
CI / checks (push) Skipped
From an issue the scripted operator files and assigns in Gitea, through
the restatement, go-ahead, milestone and PR, a review comment answered
with a pushed fix, to an approved and merged PR and a closed item and
issue. The operator acts in Gitea through its own test account
(NISSE_OPERATOR_TOKEN) and in the item's thread through the in-memory
transport. Runs from scripts/e2e.sh.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-03 14:20:07 +00:00
dongarandClaude Opus 5.5 b9f52be42c Add the end-to-end test, run after each milestone (M1.6)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 1m48s
tests/integration/test_end_to_end.py drives the whole assembled agent
(real models, the Gitea sandbox, a real build host) through a milestone
with a scripted operator, and checks what bring-up run 3 checked by hand:
a PR holding only the work, pushed with the push credential; no
credential in the clone; the planner's view carrying facts, not the
executor's turns. It cleans up after itself on the sandbox and the build
host.

scripts/e2e.sh runs it on the bring-up build VM (or --local). It has its
own marker, e2e, kept out of check.sh and CI since it spends tokens.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-02 22:59:13 +00:00