- Questions never change state (L5, #77): a message ending in "?" to a
waiting project item starts a question run (reply and look-only tools,
an instruction to change nothing), and the item goes back to the very
wait it was in: a restatement up stays up and a go binds to it; the
agent's own question stays open.
- Explanations: a restatement gives its reasons and the main alternative;
a revision says what changed (restate(changed), sent back without it);
a milestone's summary says what was done, verified and left open.
- Progress in prose (#42): the driver's and a helper's own words for a
turn are posted, trimmed, at most once a minute per item; `details`
shows the last tool calls; a message arriving mid-run is acknowledged at
once ("Noted; ...").
- CI: the e2e job's comments and the plan no longer claim a newer push
cancels the run it supersedes (Gitea here doesn't); the concurrency
block goes.
Tests: conversation unit tests (questions in a go-ahead and an answer wait,
an unanswerable question, revisions, progress rate and trimming, details,
mid-run notes), the helper's progress, the walk asking questions in every
state with a questions_change_nothing property (routing questions the old
way fails 32 of 48 seeds), and an e2e question while a restatement is up.
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
Found by the first local e2e run: qwen3.8-27b put a new project's code in
the same PR as its ARCHITECTURE.md, with no build plan. D1 says a `design`
item agrees its design before any code, and that rested on wording only.
- Until a PR of a `design` item has merged, finish_milestone is sent back
if the milestone changes anything but ARCHITECTURE.md and docs/, naming
the paths to take out. The merge is recorded (design_merged) and code
may follow.
- The label's instruction and the new project's brief say so plainly:
documents first, in a PR of their own; code after it has merged.
Tests: a design milestone with code is sent back and only the documents
are published, then code after the merge; the walk's model follows the
rule.
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
- Every milestone branch is cut from the latest default branch: the next
milestone builds on the merged previous one, and a redo after a closed PR
drops the rejected work. Uncommitted work comes along.
- While the item's PR is open, start_milestone is refused, with the PR's
state read from Gitea at that moment, not the last watch round.
- finish_milestone(final): earlier PRs say "Part of #N", the last "Closes
#N"; unsaid, it's final, as before.
- close_item with the item's PR still open waits for the merge (L2: a
closed item leaves nothing open).
- The driver's instructions cover ARCHITECTURE.md and build plans under
docs/plans/ (D2); the harness never parses a plan.
- Parking stashes uncommitted work and pushes it to <item>-parked, put back
on resume, instead of committing it onto the item's branch. The walk
found a half-done review fix parked onto a PR that had merged meanwhile,
where it was lost. Architecture D4's parking line says so.
Tests: unit tests for fresh milestone branches, the merge wait (including
a merge not yet watched), redo after a closed PR, Part of/Closes, close
waiting on an open PR, and the parked-fix regression; the walk's new
milestones_start_fresh property (fork-from-current fails 9 seeds); an e2e
two-milestone feature.
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE