Commit Graph
2 Commits
Author SHA1 Message Date
dongarandClaude Opus 5.5 3813ad55d6 nisse-review: read code from a git clone kept between runs
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 2m3s
CI / e2e (pull_request) Successful in 4m5s
Archives were downloaded and unpacked afresh for every run, which doesn't
scale to very large repositories. Each repository is now cloned once, with
its whole history, under scratch/repos/<owner>/<name>/ (head/ the clone,
base/ a worktree when read). A run fetches every branch and the PR's
refs/pull/N/head, checks out the head exactly, and fails if that head is
gone. Only the latest repository is kept for now.

Git runs walled off: none of the host's git configuration, links checked
out as plain files, no hooks, submodules or LFS, only the Gitea URL's
protocol, and the token as an http.extraHeader for that URL in git's
environment only. A stop ends a git command; a cut-short first clone is
removed. The reader never shows .git. GiteaClient.archive is gone.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01J5Utyfzw7gF7UhjRDEtjTk
2026-10-17 20:37:12 +00:00
dongarandClaude Opus 5.5 f59d974a95 M7.3: nisse-review's first slice
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 1m49s
CI / e2e (pull_request) Successful in 3m18s
A new package over nisse-core: it reviews every ready PR in the
repositories its account can read, and posts one COMMENT review.

- scheduler: each round, open PRs per readable repository (or the
  configured repositories); an item per PR, ready unless draft or WIP;
  closed with the PR. One review at a time, oldest first.
- reader: the repository at head and base from Gitea archives, unpacked
  and read in Python (read_file, list_files, search_code), and its issues;
  bound to the item's repository; no git, no shell.
- review: starts from the PR, commits, diff, comments, closed issues, CI;
  comment drafts a point on any existing line; post_review posts one
  COMMENT review at the head, inline where Gitea takes it, else as links in
  the summary. ask_expert; vault and memory (memory/nisse-review).
- L8: posting is an intent; recovery asks Gitea for the marked review and
  never posts twice; with Gitea down, the item waits.
- Failures retried, then said on the PR until the next push.
- Startup refuses an account that can push to or administer any repo.
- nisse-core gitea: readable_repositories, open_pull_requests, diff,
  commits, archive, issue, search_issues, reviews, post_review; PR fields.
- Bring-up: scripts/review-bringup.sh; nisse-review.example.yaml.
- Tests: unit over a fake Gitea and scripted model; a live test
  (NISSE_REVIEW_GITEA_TOKEN) reviews a PR in a fresh test repository.
- Docs: Development Plan M7.3, Tuning Guide (tuning.review.*).

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01J5Utyfzw7gF7UhjRDEtjTk
2026-10-13 22:34:02 +00:00