Commit Graph
15 Commits
Author SHA1 Message Date
dongarandClaude Opus 5.5 ab469b60bb M3.3: the trust dial (the agent merges approved PRs)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 2m29s
CI / e2e (pull_request) Successful in 11m23s
A project's trust.merge is operator (the default) or approved (L3, D5,
#65). Set to approved, the harness, never the model, merges a PR in the
PR watch once an approving review from a gitea.operators account is on
its current commit, its checks pass (none at all counts; pending
waits) and it's mergeable; the item then goes on as after any merge.
Each reason to hold off (failed checks, conflicts, a refused merge) is
said once per commit.

Gitea enforces it: protection requires approvals from an operators-only
whitelist and dismisses stale ones. At start, for each approved
project, the agent checks by behaviour that its own unapproved merge is
refused, with a throwaway branch and PR made through the API (never the
workspace); if it isn't refused, the operator merges until a restart.

- gitea: approvals, combined check status, a PR's head commit and
  mergeability, API-made branches and their deletion.
- Test and bring-up repositories get the protection.
- Tests: the decision (unit), the hard wall on a real Gitea
  (test_trust_live), an e2e test where the operator only approves, and
  a walk property, merges_only_approved, checked against a mutant that
  ignores which commit was approved.

Closes #65

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-08 13:48:16 +00:00
dongarandClaude Opus 5.5 0064ec7696 Fixes from the rest of the live session
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 2m13s
CI / e2e (pull_request) Successful in 3m22s
- A near miss for abandon ("abort", "cancel", "drop it", ...) in an item's
  thread is asked about, and changes nothing.
- The driver is told only the operator stops or closes an item, so it
  doesn't claim to have done either.
- An issue assigned again after its item closed starts a new item that
  notes the one before (Gitea's timeline gives the assignment time);
  item_for_issue returns the latest item.
- Abandoning an issue Gitea won't close because of open dependencies says
  so, naming them.
- An agreed item isn't offered restate.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-08 02:16:51 +00:00
dongarandClaude Opus 5.5 ad2d090143 New projects from conversation (M2.5, PR B)
- propose_project(name, purpose, decisions) in a conversation goes up for
  a go-ahead (checked: a slug, not an existing project, no trailing
  question).
- On go, the provisioning checklist (D1): a repository with a README,
  protection on its default branch, the agent as a collaborator, a build
  VM, a deploy key, and the project entry as YAML with <...> to fill in.
- On "done", the agent reads its configuration again and adds the new
  project live (build_loop_agent(load=...); only additions), then checks
  what was provided (D4, verified, not assumed): permissions and
  protection as it sees them, then on a throwaway branch with an empty
  commit, a branch push must succeed and a push to the default branch and
  merging its own PR must be refused. The check's PR is closed and its
  branch deleted. Failures are said per item; nothing starts.
- Checked: the tracking issue (the distilled decisions, carrying the new
  item's ID), and the project's item, agreed and labelled `design`, whose
  first milestone is ARCHITECTURE.md and the build plan. A conversation
  waiting on provisioning doesn't close as idle.
- The walk replays exactly from its seed (item IDs too), and event IDs
  stay unique across simulated restarts, as a server's are.
- The test config holds output to 8192 tokens, under the test key's
  per-request cost cap.

Tests: new-project unit tests (checklist and its YAML parse as config, done
before the entry, what isn't set up, a checked project's record and first
PR, an existing name), protection enforced by a hook on the fake forge,
the walk proposing projects and saying done, and an e2e new project in a
repository the test operator provisions from the agent's checklist.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-07 15:39:00 +00:00
dongarandClaude Opus 5.5 3f54896f65 Conversations on the new loop (M2.5, PR A)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 5m14s
- A top-level message that isn't a command is a conversation: an item in
  the `general` scope (L1), threaded under the operator's message, with
  `reply`, `ask_human` and `propose_work` and no workspace or execution.
  `general` is reserved as a project name.
- propose_work(project, title, summary) goes up as a revision for a
  go-ahead (or a plain yes). On go, under a file_issue intent (L8), the
  record issue is opened in that project, assigned to the agent and
  carrying the new item's ID; its item starts agreed, with the summary as
  its brief. Intake skips any issue carrying an ID (D1); boot adopts a
  filed issue or puts the proposal up again.
- A conversation closes after tuning.loop.general_idle_s (default a day);
  a reply in its thread then starts a new conversation that continues it.

Tests: conversation unit tests (threading, filing, the marker, an unknown
project, changes, idle close and continuation, a plain yes, both crash
cases, commands at top level); the walk with conversations, proposals and
idle time, and records_have_one_item / conversations_do_no_work; an e2e
conversation that becomes filed work.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-06 04:26:40 +00:00
dongarandClaude Opus 5.5 cceb30c729 The queue: parking, the operator's order, blocked items (M2.2)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 3m26s
Several work items on the new loop (L1, D4):
- Switching parks the item on the workspace: its work is committed and its
  branch pushed; resuming checks the item's branch back out. Branches of
  open items are never set aside by a fresh workspace.
- Next item: the operator's "do #N next" first, otherwise the oldest.
- Issues with open Gitea dependencies are blocked until they close, checked
  at intake and on every round; status shows blocked items and the line.

Tests: queue unit tests, the property walk over several issues with
dependencies and a new parked_work_safe property (it catches parking
disabled), and an end-to-end test with two issues where B depends on A.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-04 13:34:09 +00:00
dongarandClaude Opus 5.5 21744efac1 Milestones and review in the new loop (M2.1, PR C)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 1m48s
A work item starts from a fresh workspace: fetch, set aside (never
discard) leftover changes, branches and unpushed commits, a clean default
branch, and a branch of its own (D3, #62). start_milestone cuts the
milestone's branch; finish_milestone commits only the work, pushes and
opens a PR that closes the issue, under an intent, adopting an open PR and
treating a closed one as the operator's answer (D4). Between runs the
loop watches each item's PR: operator comments and inline review notes
(#69) reach the item, a merge or close hands back to the driver. A review
fix is checked after it's pushed and goes out as a new PR if the PR merged
first (D5). At boot an interrupted publish is settled against Gitea (L8).

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-02 23:53:02 +00:00
dongarandClaude Opus 5.5 f84bb70839 The new loop's core: intake, restatement, go-ahead, threads (M2.1, PR B)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 1m44s
nisse_dev.loop runs alongside control.py, chosen with `loop: new`.
Issues assigned to the agent (by an operator, or filed by one) become work
items, each with a Matrix thread. A driver run is one model with tools
until it calls a waiting tool: restate puts rev-N up for a go-ahead, bound
to the revision on screen when the reply arrived; ask_human waits for an
answer; close_item closes the item and its issue. Before the go-ahead the
driver can look but not change or close anything. One item is active at a
time; replies in an item's thread go to it. On boot, an item cut off
mid-run waits on the operator, and waiting points are put up again.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-02 23:46:42 +00:00
dongarandClaude Opus 5.5 c931ac939b Let pushes go by an HTTPS token or an SSH deploy key
CI / checks (push) Skipped
CI / checks (pull_request) Failing after 56s
The push credential is either a push-only account's token, handed to git
through a credential helper that names environment variables, never
values, or a deploy key in a short-lived ssh-agent. The remote URL
follows the credential. Configured as gitea.push_user and push_token, or
gitea.push_key.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-02 21:59:56 +00:00
dongarandClaude Opus 5.5 761ebdb857 Run every command on the build VM over SSH (M1.3)
CI / checks (push) Skipped
CI / checks (pull_request) Failing after 55s
execution.SSHHost.execute is now the only way the agent runs anything
(L13). Commands travel as a script on SSH's stdin, so the secrets handed
to a call are never on a command line, and every value handed out is
redacted from the output. Timeouts kill the remote process group, and
an unreachable host is reported as such, not as a failed command.

Workspace and GitRepo run on the build VM. The clone uses the
repository's SSH URL, so no credential is stored in it (#89); fetches
and pushes get the push key over stdin, in a short-lived ssh-agent,
and PRs are still opened from the agent's host with its API token.
The bench runs on the build host too.

Tests reach "the build VM" through a throwaway local sshd (nisse_dev
.testing); CI installs openssh-server. The live push test now pushes
with the sandbox's deploy key (NISSE_PUSH_KEY).

Fixes #89.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-02 21:39:46 +00:00
dongarandClaude Opus 5.5 1ad0b2147d Retire the old build spec, and point every reference at the architecture (M0.1)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 1m22s
Development Plan M0.1. Every section reference in code, tests, specs/,
the example config, the tuning guide, and the CLAUDE.md and README files
now cites docs/Architecture.md (P, L, D, O, X, Q) instead of the old
spec's A-H, and docs/Architecture-Build-Spec.md is deleted (git keeps
it). The plan's old-to-new table goes with it.

Mostly mechanical, with a per-site choice where one old section split:
A4 became L2 where it meant stop/abandon/the loop and L3 where it meant
approvals; A10 became L6 in the context-budget code and L7 elsewhere; B2
became D4 for outbound Gitea and publishing and D5 for review intake;
'A3 step N' became the matching step of L8's boot sequence. Comments
describing behaviour the architecture drops (planning always escalating,
thresholds tuned at an old build step) now describe the current code and
point at the Development Plan.

docs/Architecture.md gains one line the rewrite missed: intake outages
delay but never fail work (old B2), now in L5, where the poller and
Matrix code cite it.

Comments and docs only; no behaviour change.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-01 00:17:48 +00:00
dongarandClaude Opus 5.5 d68e3b3a83 Add the abandon command
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 1m18s
A4 already names abandon as one of the ways out of a halt (continue,
re-plan, or abandon) and 0.2 closes a work item as completed or
abandoned, but no command did it: from a gate or a question the only way
to drop a task was to edit the state database.

- 'abandon' ends the task from any waiting state and returns to IDLE.
  The move is made durable first; then the plan issue and any open
  milestone PR are closed with a note (branches kept), and any
  unresolved intent is aborted so boot reconciliation does not gate on
  work dropped on purpose. A Gitea failure is reported, not fatal.
- Like 'status' it is a command in every state, never read as an answer
  or feedback. While work runs, 'stop' comes first, as before.
- The restart / stranded question and the PR_OPEN hints mention it.
- Spec: B1 gains the abandon edge and B2 the command.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-09-29 17:43:43 +00:00
dongarandClaude Opus 5.5 15d69799bf Make the config file the only home for settings
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 51s
With no production instance yet, there is no reason to carry two ways
of configuring the agent. Every environment variable that duplicated a
config key is gone; the environment now supplies only the secrets the
file references by ${…}, plus NISSE_CONFIG and NISSE_ENV to find the
files.

- AgentConfig loads from a file (load, from_file) or a parsed tree
  (from_tree, for tests); a missing file is an error naming the example
- The from_env constructors on LiteLLMClient, AnthropicPassthroughClient,
  GiteaClient, MatrixConfig and RoleMap are removed, with the env
  reading for max output tokens; clients take their settings from config
- The live integration tests share a committed agent config,
  tests/integration/nisse-test.yaml, aimed at test resources, and one
  conftest that loads it and builds clients. NISSE_LIVE_PLANNER_MODEL
  becomes its planner role; NISSE_CAPABILITY_MODELS stays as a per-run
  switch
- A missing secret now fails the live tests instead of skipping them
- CI passes only the three tokens
- .env.example is secrets only; spec A5 says config comes from the file

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-09-23 23:25:58 +00:00
dongarandClaude Opus 5 d508e9a9b7 Externalise plans to Gitea and accept approvals there (A4, Part H)
CI / checks (push) Successful in 43s
CI / checks (pull_request) Successful in 41s
- approvals.py: PlanBoard opens one issue per project and posts each
  plan revision as a comment carrying its rev tag. The state store
  keeps only a pointer, so gate state can be re-derived from Gitea
  after a state-volume loss — external truth wins
- Gitea comments are a second approval source: revision binding, the
  typed word approve, and first-approval-wins work exactly as over
  transport, with a per-channel allowlist because a Gitea login is
  not a Matrix MXID
- Outcomes are echoed to the other channel, so the two records cannot
  silently disagree about what was approved
- A Gitea outage degrades durability of the record, not the ability
  to approve: planning proceeds and Matrix remains a complete channel
- Live test now asserts the server refuses the agent's own merge and
  its push to the protected branch. That property was previously
  true only because our code did not attempt it; branch protection
  makes it structural, and this test fails if the protection is ever
  relaxed
- Fixed a race in the process-group test: killing a group is
  asynchronous and the grandchild is an orphan, so its exit is not
  synchronised with our return; the test now waits for death

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-07 22:15:08 +00:00
dongarandClaude Opus 5 8dd5e3eb15 Page to the end when searching for an existing PR
CI / checks (push) Successful in 19s
CI / checks (pull_request) Successful in 15s
find_pull_request read only the newest 50 per state, so once a repo
passed that many pull requests a "not found" would mean "not in the
newest page" — and the A3 reconciler would read that as "the PR was
never opened" and open a duplicate. Exactly the side effect the
intent log exists to prevent.

It now pages until a short page proves the end, and raises rather
than answering "absent" from an incomplete search; the reconciler
turns that into unverifiable and gates to the human.

Found while wiring CI: every CI run opens a PR in the sandbox, so the
threshold would have been crossed in weeks rather than never.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-07 20:31:31 +00:00
dongarandClaude Opus 5 2071e6ab6d Add Gitea client and git operations (B2) — step 6a, part 1
CI / checks (push) Successful in 16s
CI / checks (pull_request) Successful in 14s
The standalone half of the Gitea layer; orchestrator wiring follows
once the executor loop lands, to avoid colliding with it in
control.py.

- gitea.py: GiteaClient over httpx — open PRs, list and post issue
  comments, close PRs. find_pull_request is the A3 external-truth
  query that makes opening a PR idempotent across a crash, and it
  checks closed PRs too, since a crash after opening must not be
  answered with "nothing is open, so open another"
- pull_request_reconciler: an unreachable Gitea returns None rather
  than a guess, so the agent gates to the human instead of risking a
  duplicate side effect
- git.py: branch, commit, push for the workspace. The token is passed
  per-invocation rather than stored as a remote, so it never lands in
  .git/config, and anything raised is scrubbed of it
- commit_all returns None when there is nothing to commit: an empty
  milestone is a fact to report, not an error
- Live test does the real round trip against the sandbox repo and
  cleans up after itself

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-07 20:27:34 +00:00