Commit Graph
5 Commits
Author SHA1 Message Date
dongarandClaude Opus 5.5 cceb30c729 The queue: parking, the operator's order, blocked items (M2.2)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 3m26s
Several work items on the new loop (L1, D4):
- Switching parks the item on the workspace: its work is committed and its
  branch pushed; resuming checks the item's branch back out. Branches of
  open items are never set aside by a fresh workspace.
- Next item: the operator's "do #N next" first, otherwise the oldest.
- Issues with open Gitea dependencies are blocked until they close, checked
  at intake and on every round; status shows blocked items and the line.

Tests: queue unit tests, the property walk over several issues with
dependencies and a new parked_work_safe property (it catches parking
disabled), and an end-to-end test with two issues where B depends on A.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-04 13:34:09 +00:00
dongarandClaude Opus 5.5 651551aab4 Answer where asked, wait on a merge, and let the driver title PRs
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 2m17s
From the new loop's first live run (sandbox #255, PR #256):
- A question asked on the PR is answered on the PR (an inline one quoted
  with its file and line, since the API can't reply in its thread), with
  a pointer in the item's Matrix thread; one asked in Matrix stays there.
- wait_for_review: when a review needs no change, or only the operator's
  merge is left, the item waits on the merge instead of on an answer.
- finish_milestone takes the PR's title from the driver.
The e2e test's merge waits out Gitea's brief 'try again later' after a
push.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-03 17:29:28 +00:00
dongarandClaude Opus 5.5 37965aefca Fix the run-breaking tool-result order; e2e test runs the slice (M2.1, PR D)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 2m17s
The first live run of the new loop's e2e test found that a fact recorded
while start_milestone was in flight landed between the tool call and its
result; both API formats reject that, so every later request in the run
failed. Views now keep each result right after its call. Scripted test
models check the APIs' ordering rules, so this can't pass unit tests
again.

The e2e tests no longer depend on the sandbox's history: each run asks for
a uniquely named function and works against a base branch of its own,
deleted afterwards. The review step asks for a change that can't already
be there. The scripted operator gives up after five fruitless answers, and
each run keeps its state store for inspection. The driver's prompt says
review fixes stay in the current milestone.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-03 15:11:06 +00:00
dongarandClaude Opus 5.5 266b5dbbd7 Check loop.qnt's properties against the real loop (M2.1, PR D part 1)
CI / checks (push) Skipped
test_loop_properties.py walks the new loop with a seeded mix of operator
and Gitea actions (go-aheads, stale go-aheads, answers, comments, merges,
the comment-then-merge race, closes, abandon, a crash and restart) and an
adaptive scripted model, checking every loop.qnt property after every
step. It found two bugs, both fixed with regression tests: abandoning an
item left its open PR open (the model's fix 1, now in code), and after a
review fix became a follow-up PR, the next fix went to the merged branch.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-03 14:19:19 +00:00
dongarandClaude Opus 5.5 21744efac1 Milestones and review in the new loop (M2.1, PR C)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 1m48s
A work item starts from a fresh workspace: fetch, set aside (never
discard) leftover changes, branches and unpushed commits, a clean default
branch, and a branch of its own (D3, #62). start_milestone cuts the
milestone's branch; finish_milestone commits only the work, pushes and
opens a PR that closes the issue, under an intent, adopting an open PR and
treating a closed one as the operator's answer (D4). Between runs the
loop watches each item's PR: operator comments and inline review notes
(#69) reach the item, a merge or close hands back to the driver. A review
fix is checked after it's pushed and goes out as a new PR if the PR merged
first (D5). At boot an interrupted publish is settled against Gitea (L8).

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-02 23:53:02 +00:00