Fixes counterexample 5 from specs/orchestrator.qnt. A crash after the
PR was opened but before PR_OPEN was recorded left the agent in
EXECUTING; the restart question's 'continue' and 'start' then published
again, Gitea refused a second PR, and there was no way back to PR_OPEN.
On the live run the executor model happened to notice the existing
work; recovery must not depend on that.
- Boot (A3 step 4): in EXECUTING, if Gitea shows the milestone's PR
open, adopt it, watch it from the start, and resume in PR_OPEN with a
notice. Gitea unreachable or the PR closed: the restart question, as
before.
- MilestonePublisher.publish is idempotent: after pushing, an open PR
for the branch is adopted (and so updated) rather than a second one
opened. This also covers a PR opened whose response was lost.
- The model adopts too, gains the lost-response outcome, and now counts
PRs opened per milestone (one_pr_per_milestone was a flag the fixed
model could never set). A mutant without adoption fails the new
scenario; the properties held over 200,000 traces each.
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
On the first live run the executor committed its milestone itself, as
its plan asked. The publisher only published a commit it made, found a
clean tree, reported "no changes to publish", and left the agent in
EXECUTING, where every message is answered "busy".
- publish(): with nothing left to commit, publish anyway when the branch
has commits origin/<base> lacks; report no changes only when it has
none.
- push_followup(): same for review fixes, comparing HEAD with what the
remote branch holds (ls-remote; pushes go by URL, so there is no
tracking ref).
- Nothing to publish now gates to AWAIT_INPUT, and the reply returns to
the still-approved milestone plan.
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
Completes the B1 loop past EXECUTING, and answers the question raised
reviewing #6: PR acceptance is a milestone's final gate, so there is
no separate FINISHED state — completion returns to milestone planning
or to IDLE.
- publish.py: MilestonePublisher commits the work on a task-namespaced
branch, pushes, and opens a PR carrying the approved plan. Intent is
recorded before the first externally visible act, so a crash
anywhere in the sequence leaves a durable record and boot
reconciliation asks Gitea whether the PR exists rather than opening
a second one
- Nothing to commit is reported, not raised: the executor may
legitimately conclude there was nothing to change
- control.py: PR_OPEN state with EXECUTING -> PR_OPEN and
PR_OPEN -> {MILESTONE_PLANNING, IDLE}; operator commands
'next milestone' and 'project complete'
- A configured publisher always contributes its own reconciler at
boot, so an interrupted publish is settled against external truth
without the caller having to remember to register it
- A publish failure gates to the operator rather than retrying into a
possible duplicate
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>