Commit Graph
2 Commits
Author SHA1 Message Date
dongarandClaude Opus 5.5 cd9ab2559e Multi-milestone work and documents on the new loop (M2.4)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 3m45s
- Every milestone branch is cut from the latest default branch: the next
  milestone builds on the merged previous one, and a redo after a closed PR
  drops the rejected work. Uncommitted work comes along.
- While the item's PR is open, start_milestone is refused, with the PR's
  state read from Gitea at that moment, not the last watch round.
- finish_milestone(final): earlier PRs say "Part of #N", the last "Closes
  #N"; unsaid, it's final, as before.
- close_item with the item's PR still open waits for the merge (L2: a
  closed item leaves nothing open).
- The driver's instructions cover ARCHITECTURE.md and build plans under
  docs/plans/ (D2); the harness never parses a plan.
- Parking stashes uncommitted work and pushes it to <item>-parked, put back
  on resume, instead of committing it onto the item's branch. The walk
  found a half-done review fix parked onto a PR that had merged meanwhile,
  where it was lost. Architecture D4's parking line says so.

Tests: unit tests for fresh milestone branches, the merge wait (including
a merge not yet watched), redo after a closed PR, Part of/Closes, close
waiting on an open PR, and the parked-fix regression; the walk's new
milestones_start_fresh property (fork-from-current fails 9 seeds); an e2e
two-milestone feature.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-05 20:57:37 +00:00
dongarandClaude Opus 5.5 cceb30c729 The queue: parking, the operator's order, blocked items (M2.2)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 3m26s
Several work items on the new loop (L1, D4):
- Switching parks the item on the workspace: its work is committed and its
  branch pushed; resuming checks the item's branch back out. Branches of
  open items are never set aside by a fresh workspace.
- Next item: the operator's "do #N next" first, otherwise the oldest.
- Issues with open Gitea dependencies are blocked until they close, checked
  at intake and on every round; status shows blocked items and the line.

Tests: queue unit tests, the property walk over several issues with
dependencies and a new parked_work_safe property (it catches parking
disabled), and an end-to-end test with two issues where B depends on A.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-04 13:34:09 +00:00