Commit Graph
11 Commits
Author SHA1 Message Date
dongarandClaude Opus 5.5 dd6196c742 New projects from conversation (M2.5, PR B)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 4m56s
- propose_project(name, purpose, decisions) in a conversation goes up for
  a go-ahead (checked: a slug, not an existing project, no trailing
  question).
- On go, the provisioning checklist (D1): a repository with a README,
  protection on its default branch, the agent as a collaborator, a build
  VM, a deploy key, and the project entry as YAML with <...> to fill in.
- On "done", the agent reads its configuration again and adds the new
  project live (build_loop_agent(load=...); only additions), then checks
  what was provided (D4, verified, not assumed): permissions and
  protection as it sees them, then on a throwaway branch with an empty
  commit, a branch push must succeed and a push to the default branch and
  merging its own PR must be refused. The check's PR is closed and its
  branch deleted. Failures are said per item; nothing starts.
- Checked: the tracking issue (the distilled decisions, carrying the new
  item's ID), and the project's item, agreed and labelled `design`, whose
  first milestone is ARCHITECTURE.md and the build plan. A conversation
  waiting on provisioning doesn't close as idle.
- The walk replays exactly from its seed (item IDs too), and event IDs
  stay unique across simulated restarts, as a server's are.
- The test config holds output to 8192 tokens, under the test key's
  per-request cost cap.

Tests: new-project unit tests (checklist and its YAML parse as config, done
before the entry, what isn't set up, a checked project's record and first
PR, an existing name), protection enforced by a hook on the fake forge,
the walk proposing projects and saying done, and an e2e new project in a
repository the test operator provisions from the agent's checklist.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-06 14:07:37 +00:00
dongarandClaude Opus 5.5 3f54896f65 Conversations on the new loop (M2.5, PR A)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 5m14s
- A top-level message that isn't a command is a conversation: an item in
  the `general` scope (L1), threaded under the operator's message, with
  `reply`, `ask_human` and `propose_work` and no workspace or execution.
  `general` is reserved as a project name.
- propose_work(project, title, summary) goes up as a revision for a
  go-ahead (or a plain yes). On go, under a file_issue intent (L8), the
  record issue is opened in that project, assigned to the agent and
  carrying the new item's ID; its item starts agreed, with the summary as
  its brief. Intake skips any issue carrying an ID (D1); boot adopts a
  filed issue or puts the proposal up again.
- A conversation closes after tuning.loop.general_idle_s (default a day);
  a reply in its thread then starts a new conversation that continues it.

Tests: conversation unit tests (threading, filing, the marker, an unknown
project, changes, idle close and continuation, a plain yes, both crash
cases, commands at top level); the walk with conversations, proposals and
idle time, and records_have_one_item / conversations_do_no_work; an e2e
conversation that becomes filed work.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-06 04:26:40 +00:00
dongarandClaude Opus 5.5 064d9bf554 Projects as configuration entries (M1.4, D8)
CI / checks (push) Skipped
CI / checks (pull_request) Failing after 5m7s
- Config: `projects: {name: entry}` with repo, base_branch, workspace,
  build_host, push credential, labels (defaults added to every issue),
  secrets by ${VAR} reference with visibility (commands | harness), and
  egress (recorded, not enforced). Every problem in every entry is
  reported at once; an inline secret, a bad visibility, a repeated repo or
  a non-slug name is an error.
- The old loop runs exactly one project (only_project) and refuses more.
- The new loop is per project: each its own clone, workspace (with its
  commands-visible secrets, redacted on return), push credential and
  milestones; intake polls every project's repository; items are scoped
  to their project for every run, publish and PR watch. Issues are named
  project#14 when there is more than one project, and a bare #14 that
  matches two is asked about. Switching projects parks the one worked on
  last (all others after a boot).
- A restatement that ends in a question is sent back to the driver, not
  posted: the e2e driver kept asking "Is this the right interpretation?",
  which a plain yes can't answer.

Tests: config entries and errors, two-project assembly, two-project loop
tests (intake, own workspaces and repos, #14 in both, do-next, label
defaults, parking across projects), the property walk over two projects
with a new own_repository_only property (an item using the first
project's repo fails 15 of 16 seeds), and the restatement check.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-06 01:12:57 +00:00
dongarandClaude Opus 5.5 cd9ab2559e Multi-milestone work and documents on the new loop (M2.4)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 3m45s
- Every milestone branch is cut from the latest default branch: the next
  milestone builds on the merged previous one, and a redo after a closed PR
  drops the rejected work. Uncommitted work comes along.
- While the item's PR is open, start_milestone is refused, with the PR's
  state read from Gitea at that moment, not the last watch round.
- finish_milestone(final): earlier PRs say "Part of #N", the last "Closes
  #N"; unsaid, it's final, as before.
- close_item with the item's PR still open waits for the merge (L2: a
  closed item leaves nothing open).
- The driver's instructions cover ARCHITECTURE.md and build plans under
  docs/plans/ (D2); the harness never parses a plan.
- Parking stashes uncommitted work and pushes it to <item>-parked, put back
  on resume, instead of committing it onto the item's branch. The walk
  found a half-done review fix parked onto a PR that had merged meanwhile,
  where it was lost. Architecture D4's parking line says so.

Tests: unit tests for fresh milestone branches, the merge wait (including
a merge not yet watched), redo after a closed PR, Part of/Closes, close
waiting on an open PR, and the parked-fix regression; the walk's new
milestones_start_fresh property (fork-from-current fails 9 seeds); an e2e
two-milestone feature.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-05 20:57:37 +00:00
dongarandClaude Opus 5.5 4d9c1d7529 Threads, commands and labels on the new loop (M2.3)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 3m45s
- Commands that name their item ("go #14", "abandon #14", "stop #14")
  apply to it wherever they're said; go, approve and abandon alone at top
  level are asked about (L5). stop is never taken as an answer.
- A plain-language reply to a restatement is read by GoAheadReader, one
  model call that agrees only on a clear yes; questions never reach it. The
  agent says "taking that as a go-ahead on rev-N" first, bound to the
  revision on screen at arrival (L3, L5, D1).
- Labels steer (D1): `bug` goes ahead after tuning.loop.bug_grace_s
  (default 600 s) unless the operator replies; `discuss` isn't offered
  restate until the operator has spoken; `bug`, `discuss` and `design` add
  to the driver's instructions. A restatement asks no questions.

Tests: label and command unit tests, the property walk with labelled
issues, plain yeses, named gos and time passing (grace_only_unanswered,
discuss_talks_first), and e2e tests for a bug proceeding after its grace
period and a plain-language go-ahead.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-04 16:13:22 +00:00
dongarandClaude Opus 5.5 cceb30c729 The queue: parking, the operator's order, blocked items (M2.2)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 3m26s
Several work items on the new loop (L1, D4):
- Switching parks the item on the workspace: its work is committed and its
  branch pushed; resuming checks the item's branch back out. Branches of
  open items are never set aside by a fresh workspace.
- Next item: the operator's "do #N next" first, otherwise the oldest.
- Issues with open Gitea dependencies are blocked until they close, checked
  at intake and on every round; status shows blocked items and the line.

Tests: queue unit tests, the property walk over several issues with
dependencies and a new parked_work_safe property (it catches parking
disabled), and an end-to-end test with two issues where B depends on A.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-04 13:34:09 +00:00
dongarandClaude Opus 5.5 651551aab4 Answer where asked, wait on a merge, and let the driver title PRs
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 2m17s
From the new loop's first live run (sandbox #255, PR #256):
- A question asked on the PR is answered on the PR (an inline one quoted
  with its file and line, since the API can't reply in its thread), with
  a pointer in the item's Matrix thread; one asked in Matrix stays there.
- wait_for_review: when a review needs no change, or only the operator's
  merge is left, the item waits on the merge instead of on an answer.
- finish_milestone takes the PR's title from the driver.
The e2e test's merge waits out Gitea's brief 'try again later' after a
push.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-03 17:29:28 +00:00
dongarandClaude Opus 5.5 37965aefca Fix the run-breaking tool-result order; e2e test runs the slice (M2.1, PR D)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 2m17s
The first live run of the new loop's e2e test found that a fact recorded
while start_milestone was in flight landed between the tool call and its
result; both API formats reject that, so every later request in the run
failed. Views now keep each result right after its call. Scripted test
models check the APIs' ordering rules, so this can't pass unit tests
again.

The e2e tests no longer depend on the sandbox's history: each run asks for
a uniquely named function and works against a base branch of its own,
deleted afterwards. The review step asks for a change that can't already
be there. The scripted operator gives up after five fruitless answers, and
each run keeps its state store for inspection. The driver's prompt says
review fixes stay in the current milestone.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-03 15:11:06 +00:00
dongarandClaude Opus 5.5 266b5dbbd7 Check loop.qnt's properties against the real loop (M2.1, PR D part 1)
CI / checks (push) Skipped
test_loop_properties.py walks the new loop with a seeded mix of operator
and Gitea actions (go-aheads, stale go-aheads, answers, comments, merges,
the comment-then-merge race, closes, abandon, a crash and restart) and an
adaptive scripted model, checking every loop.qnt property after every
step. It found two bugs, both fixed with regression tests: abandoning an
item left its open PR open (the model's fix 1, now in code), and after a
review fix became a follow-up PR, the next fix went to the merged branch.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-03 14:19:19 +00:00
dongarandClaude Opus 5.5 21744efac1 Milestones and review in the new loop (M2.1, PR C)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 1m48s
A work item starts from a fresh workspace: fetch, set aside (never
discard) leftover changes, branches and unpushed commits, a clean default
branch, and a branch of its own (D3, #62). start_milestone cuts the
milestone's branch; finish_milestone commits only the work, pushes and
opens a PR that closes the issue, under an intent, adopting an open PR and
treating a closed one as the operator's answer (D4). Between runs the
loop watches each item's PR: operator comments and inline review notes
(#69) reach the item, a merge or close hands back to the driver. A review
fix is checked after it's pushed and goes out as a new PR if the PR merged
first (D5). At boot an interrupted publish is settled against Gitea (L8).

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-02 23:53:02 +00:00
dongarandClaude Opus 5.5 f84bb70839 The new loop's core: intake, restatement, go-ahead, threads (M2.1, PR B)
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 1m44s
nisse_dev.loop runs alongside control.py, chosen with `loop: new`.
Issues assigned to the agent (by an operator, or filed by one) become work
items, each with a Matrix thread. A driver run is one model with tools
until it calls a waiting tool: restate puts rev-N up for a go-ahead, bound
to the revision on screen when the reply arrived; ask_human waits for an
answer; close_item closes the item and its issue. Before the go-ahead the
driver can look but not change or close anything. One item is active at a
time; replies in an item's thread go to it. On boot, an item cut off
mid-run waits on the operator, and waiting points are put up again.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-02 23:46:42 +00:00