Gate ops writes on approved step sequences #39

Merged
dongar merged 5 commits from ops-gating into main 2026-09-23 22:26:13 +00:00
Showing only changes of commit 019fa24517 - Show all commits
+7
View File
@@ -170,6 +170,13 @@ come back to something. Components throughout this document refer to them.
Either way, it posts a notice naming both items and why it chose that one. The Either way, it posts a notice naming both items and why it chose that one. The
agent never switches away from an item that is working. agent never switches away from an item that is working.
- **A grace period comes before switching away from a waiting item.** After the
active item posts a plan or a question, the agent waits a configurable period
(default 10 minutes) before switching. An operator who is watching answers in
that time and the item carries on without a switch. Otherwise their approval
could sit behind a long milestone on the other item: once parked, an item only
becomes active again when the active one waits or closes. Closing an item needs
no grace period.
- **A parked item is ready when the agent can act on it without the operator:** it - **A parked item is ready when the agent can act on it without the operator:** it
has not started yet (a duty finding, a ticket), or intake arrived while it was has not started yet (a duty finding, a ticket), or intake arrived while it was
parked that answers what it was waiting for (an approval, an answer, a review parked that answers what it was waiting for (an approval, an answer, a review