Gate ops writes on approved step sequences #39

Merged
dongar merged 5 commits from ops-gating into main 2026-09-23 22:26:13 +00:00
Showing only changes of commit 019fa24517 - Show all commits
+7
View File
@@ -170,6 +170,13 @@ come back to something. Components throughout this document refer to them.
Either way, it posts a notice naming both items and why it chose that one. The
agent never switches away from an item that is working.
- **A grace period comes before switching away from a waiting item.** After the
active item posts a plan or a question, the agent waits a configurable period
(default 10 minutes) before switching. An operator who is watching answers in
that time and the item carries on without a switch. Otherwise their approval
could sit behind a long milestone on the other item: once parked, an item only
becomes active again when the active one waits or closes. Closing an item needs
no grace period.
- **A parked item is ready when the agent can act on it without the operator:** it
has not started yet (a duty finding, a ticket), or intake arrived while it was
parked that answers what it was waiting for (an approval, an answer, a review