Gate ops writes on approved step sequences #39
@@ -159,13 +159,21 @@ come back to something. Components throughout this document refer to them.
|
||||
arrive is a safe point, with one exception: switching is refused while intents
|
||||
are unresolved (A2). That keeps every pending intent owned by the active work
|
||||
item, so boot reconciliation (A3) stays single-item.
|
||||
- **The operator can always switch; the agent may switch on its own in one case.**
|
||||
When the active work item is waiting on the operator (an open gate, a pending
|
||||
question, or a halt in `AWAIT_INPUT`) and other work items are ready, the agent
|
||||
switches to one of them and posts a notice naming both items and why it chose
|
||||
that one. An alert must not sit for hours behind an unanswered prompt. The agent
|
||||
never switches away from an item that is working. The item it left stays
|
||||
waiting; switching answers nothing on its behalf.
|
||||
- **The operator can always switch; the agent may switch on its own in two cases,**
|
||||
when other work items are ready:
|
||||
- *The active item is waiting on the operator* (an open gate, a pending question,
|
||||
or a halt in `AWAIT_INPUT`). An alert must not sit for hours behind an
|
||||
unanswered prompt. The item it left stays waiting; switching answers nothing
|
||||
on its behalf.
|
||||
- *The active item has closed* (completed or abandoned). Ready work should not
|
||||
sit behind an idle agent until the operator notices.
|
||||
|
||||
Either way, it posts a notice naming both items and why it chose that one. The
|
||||
agent never switches away from an item that is working.
|
||||
- **A parked item is ready when the agent can act on it without the operator:** it
|
||||
has not started yet (a duty finding, a ticket), or intake arrived while it was
|
||||
parked that answers what it was waiting for (an approval, an answer, a review
|
||||
comment). An item still waiting on the operator, with nothing new, is not ready.
|
||||
- **The model chooses which ready item to switch to.** This is one of the few
|
||||
judgments it is trusted with outright, because choosing grants nothing: every
|
||||
item still meets its own gates, and a poor choice costs time, not safety.
|
||||
@@ -456,7 +464,7 @@ by replaying the operational trail:
|
||||
|---|---|
|
||||
| `state.transition` | `from`, `to`, `project` |
|
||||
| `intent.begin` / `intent.commit` / `intent.abort` | `intent_id`, `kind` |
|
||||
| `work_item.switch` | `from`, `to`, `reason`, `chosen_by` (`model` / `fallback` / `operator`) |
|
||||
| `work_item.switch` | `from` (parked or closed item, or `null`), `to`, `reason`, `chosen_by` (`model` / `fallback` / `operator`) |
|
||||
| `gate.open` / `gate.approve` / `gate.reject` | `gate`, `rev`, `channel` |
|
||||
| `boot.reconcile` | `action`, per-intent verdicts |
|
||||
| `schema.migrate` | `from_version`, `to_version` |
|
||||
@@ -890,8 +898,9 @@ PR_OPEN
|
||||
|
||||
### B2. Requirements
|
||||
|
||||
- **One active project at a time** (park-and-switch, 0.2). Operator selects it;
|
||||
other projects stay parked at their last position and resume where they left off.
|
||||
- **One active project at a time** (park-and-switch, 0.2). The operator selects it,
|
||||
or the agent switches on its own under 0.2's rules; other projects stay parked at
|
||||
their last position and resume where they left off.
|
||||
- **Operator commands** (over transport): `use <project>`, `approve`,
|
||||
`reject <feedback>`, `start milestone <n>`, `status`, `stop` (A4), plus free
|
||||
text during planning (forwarded to the agent as answers).
|
||||
|
||||