Development Plan: superseded runs are cancelled by CI now
CI / checks (push) Skipped
CI / e2e (pull_request) Canceled after 0s
CI / checks (pull_request) Canceled after 1m33s

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
This commit is contained in:
dongarandClaude Opus 5.5 committed 2026-10-08 03:36:19 +00:00
1 parent ef29a1271e
commit 9c181d973a
1 file changed
+2 -2
+2 -2
View File
@@ -81,8 +81,8 @@ Only `nisse-dev` has real code; `nisse-core` and `nisse-ops` are placeholders.
runs that full set before its image is built. The end-to-end tests drive the
real agent, every role on a local model (so they cost nothing per call), in a
repository of the run's own, with a scripted operator; CI runs them after the
checks pass. There is one runner, and a run a newer push
supersedes has to be cancelled by hand. Locally only the tests being written
checks pass. There is one runner, so a newer run for a
PR or branch cancels the one it supersedes (#126). Locally only the tests being written
(`-k`) or diagnosed (`--lf`); `scripts/e2e.sh` reports what a run spent. Manual
live runs are for the new loop's first runs and phase ends. Findings are filed as
issues and either fixed before moving on or deliberately deferred.