Development Plan: superseded runs are cancelled by CI now
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
This commit is contained in:
1 parent
ef29a1271e
commit
9c181d973a
1 file changed
+2
-2
@@ -81,8 +81,8 @@ Only `nisse-dev` has real code; `nisse-core` and `nisse-ops` are placeholders.
|
||||
runs that full set before its image is built. The end-to-end tests drive the
|
||||
real agent, every role on a local model (so they cost nothing per call), in a
|
||||
repository of the run's own, with a scripted operator; CI runs them after the
|
||||
checks pass. There is one runner, and a run a newer push
|
||||
supersedes has to be cancelled by hand. Locally only the tests being written
|
||||
checks pass. There is one runner, so a newer run for a
|
||||
PR or branch cancels the one it supersedes (#126). Locally only the tests being written
|
||||
(`-k`) or diagnosed (`--lf`); `scripts/e2e.sh` reports what a run spent. Manual
|
||||
live runs are for the new loop's first runs and phase ends. Findings are filed as
|
||||
issues and either fixed before moving on or deliberately deferred.
|
||||
|
||||
Reference in new issue
Block a user