Development Plan: superseded runs are cancelled by CI now
CI / checks (push) Skipped
CI / e2e (pull_request) Canceled after 0s
CI / checks (pull_request) Canceled after 1m33s

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
This commit is contained in:
dongarandClaude Opus 5.5 committed 2026-10-08 03:36:19 +00:00
1 parent ef29a1271e
commit 9c181d973a
1 file changed
+2 -2
+2 -2
View File
@@ -81,8 +81,8 @@ Only `nisse-dev` has real code; `nisse-core` and `nisse-ops` are placeholders.
runs that full set before its image is built. The end-to-end tests drive the runs that full set before its image is built. The end-to-end tests drive the
real agent, every role on a local model (so they cost nothing per call), in a real agent, every role on a local model (so they cost nothing per call), in a
repository of the run's own, with a scripted operator; CI runs them after the repository of the run's own, with a scripted operator; CI runs them after the
checks pass. There is one runner, and a run a newer push checks pass. There is one runner, so a newer run for a
supersedes has to be cancelled by hand. Locally only the tests being written PR or branch cancels the one it supersedes (#126). Locally only the tests being written
(`-k`) or diagnosed (`--lf`); `scripts/e2e.sh` reports what a run spent. Manual (`-k`) or diagnosed (`--lf`); `scripts/e2e.sh` reports what a run spent. Manual
live runs are for the new loop's first runs and phase ends. Findings are filed as live runs are for the new loop's first runs and phase ends. Findings are filed as
issues and either fixed before moving on or deliberately deferred. issues and either fixed before moving on or deliberately deferred.