Several work items on the new loop (L1, D4):
- Switching parks the item on the workspace: its work is committed and its
branch pushed; resuming checks the item's branch back out. Branches of
open items are never set aside by a fresh workspace.
- Next item: the operator's "do #N next" first, otherwise the oldest.
- Issues with open Gitea dependencies are blocked until they close, checked
at intake and on every round; status shows blocked items and the line.
Tests: queue unit tests, the property walk over several issues with
dependencies and a new parked_work_safe property (it catches parking
disabled), and an end-to-end test with two issues where B depends on A.
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE