CI caught the executor recording an empty milestone as a success: the
model answered with prose on its first turn, and the loop reads "no
tool call" as "the plan is done". It had therefore finished a
milestone having touched nothing, and the milestone would have gone
on to publish with no changes.
A completion claim is now challenged once when no tool has been
called yet — the same shape as the planner's nudge — and a model that
persists escalates instead of reporting success. After the first tool
call the claim is taken at face value, as before.
The live milestone test failed roughly one run in five on this; four
consecutive runs pass now.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
- approvals.py: PlanBoard opens one issue per project and posts each
plan revision as a comment carrying its rev tag. The state store
keeps only a pointer, so gate state can be re-derived from Gitea
after a state-volume loss — external truth wins
- Gitea comments are a second approval source: revision binding, the
typed word approve, and first-approval-wins work exactly as over
transport, with a per-channel allowlist because a Gitea login is
not a Matrix MXID
- Outcomes are echoed to the other channel, so the two records cannot
silently disagree about what was approved
- A Gitea outage degrades durability of the record, not the ability
to approve: planning proceeds and Matrix remains a complete channel
- Live test now asserts the server refuses the agent's own merge and
its push to the protected branch. That property was previously
true only because our code did not attempt it; branch protection
makes it structural, and this test fails if the protection is ever
relaxed
- Fixed a race in the process-group test: killing a group is
asynchronous and the grandchild is an orphan, so its exit is not
synchronised with our return; the test now waits for death
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>