Files
nisse/nisse-dev/tests
dongarandClaude Opus 5.5 21744efac1
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 1m48s
Milestones and review in the new loop (M2.1, PR C)
A work item starts from a fresh workspace: fetch, set aside (never
discard) leftover changes, branches and unpushed commits, a clean default
branch, and a branch of its own (D3, #62). start_milestone cuts the
milestone's branch; finish_milestone commits only the work, pushes and
opens a PR that closes the issue, under an intent, adopting an open PR and
treating a closed one as the operator's answer (D4). Between runs the
loop watches each item's PR: operator comments and inline review notes
(#69) reach the item, a merge or close hands back to the driver. A review
fix is checked after it's pushed and goes out as a new PR if the PR merged
first (D5). At boot an interrupted publish is settled against Gitea (L8).

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-02 23:53:02 +00:00
..