Files
nisse/nisse-dev/tests
dongarandClaude Opus 5.5 88c7d2e8c9
CI / checks (push) Skipped
CI / checks (pull_request) Successful in 5m4s
CI / e2e (pull_request) Successful in 24m22s
A design milestone holds documents only, enforced
Found by the first local e2e run: qwen3.8-27b put a new project's code in
the same PR as its ARCHITECTURE.md, with no build plan. D1 says a `design`
item agrees its design before any code, and that rested on wording only.

- Until a PR of a `design` item has merged, finish_milestone is sent back
  if the milestone changes anything but ARCHITECTURE.md and docs/, naming
  the paths to take out. The merge is recorded (design_merged) and code
  may follow.
- The label's instruction and the new project's brief say so plainly:
  documents first, in a PR of their own; code after it has merged.

Tests: a design milestone with code is sent back and only the documents
are published, then code after the merge; the walk's model follows the
rule.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPQ14L3LikyefCMFBqEbKE
2026-10-07 15:39:00 +00:00
..